Quote:
Originally Posted by larryn
GET TO WORK!
|
Ok! The t-braces that tie the lateral lateral links together and back up to the rear cross member went in today, as did the front lower tie-brace. The front tie-brace ties the control arms together in the front crossmember via the jacking plate. The fuel filler neck went in back in today, too. Total working time today was about 3-1/2 hours, just enough to freeze my hands. While I got the air temp up to about 50 deg in the garage, the tools were still at about 30 deg! If I can figure out how to get some decent angles, I'll get some pics of the new parts up tomorrow.
Next up will be getting the e-brake hooked back up to the handle for when the car heads to the body shop.